Home Adaptation & Mobility Experts

Our Products
Our Service

Changing Places at Lanyon Place

The Changing Place at Belfast Lanyon Place is designed to provide people with mobility restrictions a comfortable and dignified bathroom experience when passing through the station.

The new facility was officially completed on 13th May 2019. Sync Living supplied key equipment and advice aligned with the Changing Places Guidelines.

About Belfast Lanyon Place

Lanyon Place, formerly known as Belfast Central, is a railway station in Belfast. It is one of the stations located in Belfast City Centre.

Located on east bridge street, it has 4 platforms and the station services Newry-Belfast-Bangor line, Larne line, Derry-Londonderry line and Dublin line.

It is the second busiest station on the Northern Ireland Railways network in terms of passenger footfall annually.

About Belfast Lanyon Place and Sync Living

Andrew Smyth, Sync Living Changing Places Specialist, is satisfied with the results of the Changing Places at the Belfast Lanyon Place

Andrew commented on the Changing Places at the Lanyon Place Railway Station that:

As the main provider of public transport in Northern Ireland Translink should be congratulated in committing to ensuring their co-ordinated bus and rail services are accessible to all.

Lanyon Place is one of 4 stations serving Belfast City Centre and is the first in the city to include a Changing Places facility. This investment by Translink not only in Belfast but also in other hubs throughout NI sets the company apart in spear heading inclusion for individuals with more complex care needs and their carers.

It was a pleasure working with Translink and also the Main and M&E Contractors to secure the correct specification of key products required to meet the Changing Places / BS8300:2018 standard were installed at Lanyon Place.

If you would like to know more about how to make your building accessible for people with physical or mental impairment and their carers, feel free to get in touch with Andrew at andrew@syncliving.co.uk.

Project Highlights
Location:

Belfast Lanyon Place Railway Station

Project Type:

Changing Places Facility

Building Type:

Transport Hub

Contractor:

Main Contractors: Cleary Construction M&E Contractors: Victoria Mechanical Services

Key Features
  • Bench – Height Adjustable, Adult Sized, Wall Mounted
  • Hoist – Ceiling Track
  • Peninsular Automatic Toilet
  • Washbasin Height Adjustable
  • Non Slip Floor
  • Floor Space (sq. m) – 12
  • Emergency Alarm
  • Privacy Screen
  • Paper Roll
  • Radar Key
  • Managed
  • Locked

Pin It on Pinterest